📑 Field Scope 🛡️ ZERO-PII
📋 Claim Context & Property Inspection
📸 Inspection Photo Vault (0 Attached) CAMERA READY

Snap test squares, slope overviews, collateral, or select multi-page photos & PDFs

🎙️ Adjuster Field Notes & Test Square Counts

DOC Field Scope & Xactimate Summary

Zoom: 100%

💬 Adjuster Co-Pilot • Live Follow-Up Q&A & Scope Refinement

INSPECTION CONTEXT ACTIVE
💡 Initial scope report ready! Ask any follow-up questions below: request quantity recalculations (e.g. 15% waste), add steep/high roof charges, add missing interior/exterior line items, or ask how to defend coverage decisions in your narrative against contractor disputes.
⚡ Follow-Up Task Work & Voicemail Action Log (0)

Fast 1-tap capture for adjuster follow-ups: snap a photo of a voicemail screen, note, or voice message transcript — AI automatically extracts the contact, phone #, claim reference, and action items.

🔬 Expert Opinion Review (Engineer Report Audit) STRUCTURAL AI

Upload pages of a structural engineering report (foundation, roof framing, deflection, wall shear, moisture/decay vs storm cause). DOC cross-references findings against carrier policy and produces aligned structural Xactimate line items.

Snap physical report pages or upload PDF engineering packages

Expert Engineering Audit & Structural Scope

Zoom: 100%

💬 Engineer Report Discussion & Adjuster Co-Pilot

Ask follow-ups, challenge findings, or request specific Xactimate line items
🌪️ Storm vs Wear & Tear
📐 Exact Structural Xactimate Codes
📝 Draft Carrier File Note
⚖️ Contractor Rebuttal Note
🔍 Plain English Explanation
⚖️ Estimate Reconciler (SFE vs. Contractor Audit) VARIANCE AUDIT

Line-by-line comparison between carrier estimate (SFE) and contractor estimate (CTRE, e.g. Krause/Crous). Identifies unit price spikes, double billing, quantity mismatches, and unit conversions (PC to LF, BD to LF, RL to SF).

Estimate Reconciliation & Dispute Settlement Matrix

Zoom: 100%
❄️ 55°F Freeze Rule
💧 Drain vs Overflow
⚖️ 50% Rule & Wear Factors
🌿 Tree & Forgery Limits
🌪️ PLH ≥ 2.25\" Hail Rule
Carrier Policy & SOP Assistant

Ask any question regarding carrier guidelines, policy endorsements (Form HW, BOSD), test square standards, or appurtenance replacement matrix. You can attach photos of documents or dictate by voice.

🔍 Hail Test Square
⚖️ 50% Rule Check
💧 Drain vs Overflow
❄️ Freeze 55°F Rule
📋 Xactimate Scoping
DOC Adjuster Copilot

Ready on the field. You can dictate voice notes, snap multiple damage photos or Xactimate pages (shingles, gutters, AC fins, estimates), or ask any question about policy guidelines, SOPs, and Xactimate line items.

Carrier Guidelines Active
📜 Claim Scope History & Saved Vault (0)
⚖️ Repair vs. Replace (50% / 80% Rule) OG 75-160 § III.A
⚠️ Management Review Trigger Checker OG 75-160 § II.L
💰 Depreciation, RCV, ACV & Claim Check Settlement Calculator SETTLEMENT MATH

Calculates straight-line recoverable depreciation, age caps, actual cash value (ACV), policy deductible, and initial net payment check to the policyholder.

❄️ EagleView & Xactimate Ice & Water Barrier (RFG IWS) Calculator IRC R905.1.2 & CARRIER CODE

Instantly calculates exact, audit-defensible RFG IWS square footage from EagleView / aerial measurements (eaves, valleys, low pitch) and automatically applies the mandatory underlayment deduction (RFG FELT15 / SYNF).

Official Xactimate Line Item Quantities
Eave Ice & Water Barrier: 888 SF (148 LF × 6.0 ft)
Valley Ice & Water Barrier: 168 SF (56 LF × 3.0 ft)
Low Slope IWS (100% Deck Coverage): 0 SF
Total Ice & Water Barrier (RFG IWS): 1,056 SF
Net Underlayment (Minus IWS Deduction): 23.94 SQ
* Note: Xactimate unit price for RFG IWS includes material waste (0% waste added). 10.56 SQ (1,056 SF) deducted from 34.50 SQ total measured area for exact code compliance.
🌤️ Storm & Date of Loss (DOL) Verification Assistant NOAA & VERISK METRICS

Drafts formal claim file meteorological documentation cross-referencing NWS/SPC storm reports, radar hail swaths, and gust thresholds.

📝 Supplement & Contractor Dispute Rebuttal Defense Builder SOP DEFENSE

Instant formal rebuttal narratives for contractor supplement demands: Overhead & Profit (3-trade rule), IRC Ice & Water Shield, Drip Edge inclusion, and Fasteners.

📖 Carrier Policy & SOP Quick Reference
🌪️ Wind & Hail Inspection SOPs (Test Squares & PLH Workflow)
Test Squares (Hail): Measure 10' x 10' (100 sq ft) sample area on each slope direction. Count damaged shingles (not individual tabs). Test squares are NOT used for wind claims.
Potential Large Hail (PLH) Workflow: On-roof physical inspection may be bypassed for full replacement if Verisk hail is ≥ 2.25 inches AND collateral damage to exterior elevations is consistent with hail large enough to require roof replacement.
Unsealed Shingles: Check for broken heat seals, tearing on underlying shingle, and residue transfer to establish accidental direct physical loss vs cold/wear.
Wood Roofs: Hail damage requires a split that compromises watertight integrity and exposes fresh, light-colored wood. Weather splits show grey wood or inverted 'V'.
⚖️ Repair vs. Replace & Wear Factor SOPs
Composition Shingles (50% Rule): If repair cost approaches or exceeds 50% of the cost to remove and replace the damaged slope (walk-on 1-story base), determine whether to replace the slope.
Other Shingle/Shake Roofs (80% Rule): If repair cost approaches or exceeds 80% of the remove & replace cost, replace the slope.
Damage Repair Factors:
  - 0% to 50% worn = 1.0
  - 50% to 75% worn = 1.5
  - 75%+ worn = 2.0
Deteriorated Roofs: When roofer may damage 2-3 brittle shingles for each 1 replaced, factor feasibility of repair into slope replacement determination.
🏗️ Roof Appurtenances Replacement Matrix (OG 75-160 § IV.G)
ALWAYS Replace when Slope is Replaced: Ridge vents (metal/plastic), passive roof vents (turtle/turbine), pipe jack boots (metal/lead/rubber), valley metal, drip edge/gutter apron, rain diverter strips.
Replace ONLY IF DAMAGED by Covered Peril: Step flashing, chimney counterflashing, headwall flashing, skylight flashing, flue caps/storm collar, chimney caps, powered (electric) roof vents, solar panels, TV/satellite dishes, skylights, roof HVAC.
Note: Xactimate labor includes manipulation of undamaged flashing. Separate removal lines are not needed for left-column items because shingle tear-off includes removal labor.
❄️ Freezing Claims & 55°F Reasonable Care Standard
Reasonable Care: Freeze damage while vacant, unoccupied, or under construction is excluded unless building heat was maintained at 55°F (13°C) or higher, OR the water supply was fully shut off and drained.
Tear-Out Coverage: Pays to tear out and replace only that part of the building structure required to access and repair the failed pipe/system. (Pipe repair itself is wear/maintenance).
💧 Drain Backup vs. Overflow & Option BOSD
Covered Overflow: Fixture trap discharge/overflow (e.g., sink P-trap or toilet bowl blockage) is covered under baseline policy.
Excluded Backup: Downstream sewer/drain line backing up into dwelling requires active Option BOSD Endorsement.
NFIP Coordination: When surface flood causes sewer backup, NFIP policy is primary and Option BOSD is excess.
👣 Footfall Damage Adjustment Rules
Adjuster Footfall: Damage caused by adjuster during inspection is included in the adjustment. Add footfall shingles to storm damage before applying repair factors.
Deductible Exception: Footfall is subject to policy deductible EXCEPT where the ONLY damage to the roof is footfall caused by the adjuster — in that circumstance, reimburse the insured without taking a deductible.
🔄 Handling Prior Unrepaired Damage
• Prior paid damage that was not repaired is non-recoverable.
• Estimate new claim at current Date of Loss pricing, deduct current deductible, then subtract prior paid ACV amount for the unrepaired area. Pay net positive ACV difference.
🌿 Additional Coverages Limits (OG 75-101)
Debris Removal: Additional 5% of limit available when damage + debris exceeds coverage limit.
Trees & Landscaping: Max $750 per item, aggregate 5% of Coverage A. (Windstorm is NOT a covered peril for trees).
Credit Card / Forgery: Up to $1,000 per occurrence. NO DEDUCTIBLE APPLIES.
Locks & Remotes: Up to $1,000 following covered theft. NO DEDUCTIBLE APPLIES.
Collapse: Kitchen cabinet fall covered under weight of contents. Construction defects covered ONLY IF collapse occurs during construction.
📐 Steep Pitch & High Story Modifier Selector XACTIMATE ADDERS

Select pitch slope, building height, and tear-off layers to generate exact Xactimate category, selector codes, and composite modifier strings.

Generated Xactimate Line Scoping Codes
RFG 300
🏷️ Carrier Xactimate Selector Matrix
All Items
Roofing (RFG)
Siding (SDG)
Gutters & Flashing (GTR)
Water Mitigation (WTR)
Drywall & Paint (DRY)
Structural & Framing (STR)
💬 Report Issue / Adjuster Feedback DIRECT DISPATCH

Encountered an inaccurate SOP interpretation, photo recognition glitch, or have an idea? Attach a screenshot and note to log it or email Dewey directly.

⚙️ Adjuster Preferences & AI Model
Default recipients for 1-tap "Email to Work" reports.
Defaults to pre-configured project key automatically if blank.
📐 Field Defaults & Unit Cost Overrides
☁️ My Second Brain — Google Drive Master Hub ORGANIZED TREE

Direct 1-tap links to your organized Google Drive ecosystem folders:

💾 Storage & Full Data Backup

Export your entire DOC claim archive, preferences, and custom notes to a secure offline JSON backup file.

🔄 PWA Version & Instant Update Engine v5.9 LIVE

Installed DOC to your phone's home screen? Tap below to force the PWA to download the latest updates and purge old cached files instantly without having to delete and re-add the app to your home screen. (Your saved claim vault and settings remain 100% safe).

ℹ️ DOC System Architecture & Status
App Version: DOC Pro v5.9.0
Multimodal Engine: Gemini 2.5 Flash + Pro Auto-Failover
Privacy & Security: 🛡️ Client-Side Zero-PII Active
Saved Claims in Vault: 0 claims
📱 Install on Phone (PWA)

Open this app in Safari (iOS) or Chrome (Android) and tap "Add to Home Screen" to run it as a standalone full-screen native field app with offline capabilities.

📋

State Farm Roofing Scope Sheet

Official Verbatim Scope Form & EagleView 1-Tap Xactimate Estimatics Engine (OG 75-160)

🦅 EagleView / Hover Multi-Document Vision Scanner MULTI-PAGE AI
📸
Snap or Upload Multi-Page EagleView & Scope Sheets
Snap 1 to 5 photos (EagleView Summary, Slopes, Waste Table, Scope Sheet). Gemini Vision analyzes all documents together.
📐 Roof Geometry & Pitch Measurements:
🎯 Slope-by-Slope Damage Matrix (10x10 Test Squares & Wind Counts) State Farm Threshold: ≥ 8-10 Hits/SQ
Damage Category Front Right Rear Left
💥 Damaged Shingles / SQ Hail (Hits)
💨 Wind Damaged Shingles (Count)
🧰 Appurtenances, Flashings & Vent Counts (1-Tap Field Steppers)
💨 Roof Ventilation Always Replace
Turtle / Box Vents RFG VENTT (EA)
Turbine Vents RFG VENTTU (EA)
Continuous Ridge Vent RFG VENTR (LF)
Power Attic Vent RFG VENTP (EA)
🔩 Pipe Flashings & Gas Vents
Pipe Jack Flashings RFG FLPIPE (EA)
Gas Vent Cap 4" to 5" RFG VENTG4 (EA)
Gas Vent Cap 6" RFG VENTG6 (EA)
Gas Vent Cap 8" RFG VENTG8 (EA)
❄️ Ice & Water Shield (SAWM) & Drip Edge
Drip Edge (Eaves + Rakes) RFG DRIP (LF)
IWS at Eaves RFG IWS (LF x 3' or 6')
IWS at Valleys RFG IWS (LF x 3')
IWS Low Pitch / Full Roof RFG IWS (SF - 100% Deck)
🏠 Chimney, Step Flashing & Sat Dish
Step Flashing (If Damaged) RFG STEP (LF)
Chimney Flashing RFG FLCHM (LF)
Chimney Cap RFG CHMC (EA)
Digital Satellite Dish (D&R) RFG SATD (EA)
S26+ PRO LENS • 4K UHD
📄 Align claim prep doc, estimate or note within frame
📸 0 Scanned
📑 DOC Claims (Active) In the Boat (Journal) ✉️ MailSorter Web 🎬 MovieLog 🧠 MySecondBrain Hub
🔍
📋

Section Fullscreen View

Expanded view with high readability zoom & mobile scroll
Zoom: 100%